No Bottom Line for the South March Highlands

Legislative Gaps, South March Highlands

The City of Ottawa is slowly moving towards a sustainability mindset. According to its Director for Community Sustainability, the City is considering wider application of so-called “Triple Bottom Line” decision-making.

Sustainability

Classical decision-making in the previous century viewed the economy in isolation of the rest of society and in a context that ignored the environment. As illustrated below, interrelationships between these 3 dimensions were rarely considered.  Limited consideration was given to overlaps between 2 of these dimensions and even more rare was a sustainability mindset in which all 3 were included.

Sustainability thinking is based on traditional North American Indian philosophy that situates the person within the environment and views the ecosystem around the person as a great circle encompassing both animal life as well as the different communities of man.  This philosophy is traditionally symbolized by a Medicine Wheel as illustrated below.

<<Note that this article uses tabs, click on each tab above to see all of it.>>

TBL

The Triple Bottom Line (TBL) is a term coined by John Elkington in his 1998 book Cannibals with Forks: the Triple Bottom Line of 21st Century Business. TBL is a concept that similarly situates economic decision making within a societal context, which in turn is situated within an environmental context.

A sustainable mindset acknowledges that our society exists within the environment and not independent from it. Similarly, our business decisions exist within the society that defines the economics for them.

Consequently we need to consider intangible value as well as tangible value in making sustainable decisions.  This is illustrated below:

Considering the intangible helps avoid the trap of McNamara’s Fallacy, however, it is still possible for businesses and governments to fall into the fallacy by relying only on measurable indicators when performing a TBL analysis.

An example of falling into the trap can be seen in the Australian Government’s TBL analysis of 135 sectors of the Australian economy.  Notice the reliance of only measurable indicators when assessing intangible factors — a classic symptom of falling prey to McNamara’s Fallacy.

Ottawa's 4BL

With the caveat to be wary of McNamara’s Fallacy, TBL is certainly a step in the right direction towards sustainable decision-making.

Curiously the use of TBL in a municipal setting involves consideration of 4 (not 3) dimensions (4BL):

  1. Economic
  2. Environmental
  3. Social
  4. Cultural

The addition of a cultural dimension extends the influence of social factors.  The rationale for this is tenuous and appears to have originated in New Zealand.  In Canada, the concept seems to be gaining favour among various municipalities, including Ottawa.

According to the authors of the 4BL model, it was attractive to incorporate the 4 directions of the traditional medicine wheel as an aspect of their sustainability framework.  Evidently, there is much to be learned about sustainability from First Nations – even when it comes to creating a model for thinking about it in a holistic way.

Unfortunately, in the 4BL case this has been done in a way that hi-jacks traditional values and re-casts them in a way that inserts “money” at the expense of wildlife.  This recurring type of hi-jacking and revision of native symbols and philosophy is one of the causes of cultural genocide – and in this case is being done in the name of promoting culture!

Rather than re-invent a tried-and-true concept that has served First Nations well for thousands of years, perhaps it would have been better to centre the concept entirely on traditional concepts of stewardship and respect for Mother Earth.

As an example, a direct application of traditional values by the Ardoch Algonquin First Nation results in a rather sensible Principles of Development.

NBL for SMH

Unfortunately the City is not even close to applying TBL or 4BL criteria to the South March Highlands:

  • Neither Council or Staff took the opportunity to explore the economic benefits of green infrastructure and the Stewardship plan that was prepared as an alternative – even though it would have generated $25 M /annum in economic benefits to the city;
  • Continued development in the SMH is an environmental disaster that no one denies – yet no one at city hall does anything to prevent. Compounded by the continued wilful blindness to environmental problems caused by SWM piecemealing, water diversion, fragmentation of habitat, and extirpation of 20 species-at-risk.
  • At a social level, every community association in Ottawa endorsed protection for the SMH – yet the infrastructure staff plows forward in the face of opposition from 15,000 people.
  • The complete disrespect for the cultural heritage of first nations in the SMH is shameful. The refusal to accommodate even a reasonable request for an unbiased archaeological study is indefensible and a violation of the Canadian constitution.

Clearly there is no bottom line thinking (NBL) in the City at all when it comes to the South March Highlands.

Although Ottawa is starting to move in the right direction with sustainability thinking, it will take much more than the creation of a quad-focal “lens” and the self-congratulation that will no doubt accompany the City’s self-assessment process to implement a sustainability mindset in Ottawa.

Growing Gaps

Completely missing from the City’s implementation approach is ensuring that there is an opportunity for public participation in ALL key decisions affecting Environment, Social, and Economic dimensions.

Instead of closing this gap, the lack of acceptance of public review as an integral part of sustainable decision-making appears to be growing.  Some recent examples of a growing gap include:

  • Refusal by the City to make public review a part of any future lifting of holding conditions for lands formerly zoned as environmentally significant in the SMH;
  • Failure by City staff to bring final EAs and EA Addendum to City committees for public review and Council approval prior to issuing of Notices of Completion.  This has occurred recently for Kanata West and for the Glen Cairn Flood Investigation.
  • Issuing key technical documents less than 3 days prior to a City committee vote on the subject so as to curtail any opportunity for public review.  This occurred recently on the decision to allow a municipal drain to be constructed in the provincially significant Poole Creek Wetlands in Stittsville.

Talk and intentions are cheap and meaningless without changing how the City operates.  Not only is the current non-sustainable mindset entrenched, it appears to be  incorrigible.

As a case in point, the infrastructure approvals staff actually declared that they considered it necessary to raze Beaver Pond Forest in Kanata, just so that they could understand where the watershed boundary was!  Evidently it was not possible for them to see the watershed for the trees.

Changing how the City operates will require deep changes to management within the infrastructure approvals division.   Otherwise using the words sustainability and development in the same sentence in Ottawa will continue to be an oxymoron.

Time to walk the talk by doing the right thing!

So far Mayor Watson has done nothing to improve the situation and in fact has made matters worse by not promoting public participation as a fundamental pre-condition for sustainable development in Ottawa.

No Comments

Why Engineering Standards For Evironmental Studies Are Needed

Canadian Politics, Legislative Gaps

Ecology Ottawa conducted an analysis of political contributions made by housing developers to Ottawa City Councillors during the last municipal election.

In total, over $121,300 was contributed to winning candidates (the study did not examine contributions to losing candidates).  Top of the list was Gord Hunter who received over 49% of funding for his political campaign from developers.

Not surprising considering that Mr. Hunter is a member of the City’s Planning & Environment Committee.  Other members of the PEC that received substantial contributions are Bob Monet (32%) and Michel Bellemare (25%).

Fortunately the Chair and Vice-Chair of the committee had the integrity to decline such donations.  However, there is nothing other than personal integrity preventing them from doing so.

The municipal planning & environment committee is the only oversight that municipal environmental studies have.  The City of Ottawa has an indepedant Environmetal Advisory Committee, however, their mandate does not include quality assurance of environmental studies.

As far as the provincial Ministry of Environment is concerned, Class Environmental Assessments are conducted on a self-assessment basis.  These are the vast majority of environmental studies and the  province only requires that they be done and that they address prescribed content  - not that they be done properly!

For example the province only requires that proponents of Class Environmental Assessments consider alternatives and document their decision making process – not that they follow any specific decision making process, or even test that they have a sound process for evaluating decisions!  This is the loophole that allowed the City of Ottawa to ignore it’s own planning criteria in evaluating alternatives for the Terry Fox Road Expansion.

Another example is that the province does not provide clear-cut criteria for measuring the impact of a proposed project.  For example, the Terry Fox Road Expansion which threatens 3 endangered species (because it cuts across a Provincially Significant wetland)  is subject to the same process as the Hazeldean Road Expansion which poses no threat to endangered species (because it occurs in a semi-urban area).

So without minimum standards governing engineering practice to be followed when conducting Class EAs, there are no checks and balances in the process – other than the checks written by developers!

No Comments