Is the City Engineering or Politicizing Public Safety?

Green Reality

According to the Ottawa Citizen, on Jan 13, 2012, the City of Ottawa issued the following public statement to the media:

“As indicated in the Phase 1 Aecom Study the City commissioned, the City shares the community’s concerns with regard to the further utilization of Kizell and Beaver Ponds from both a capacity and environmental impact perspective as a stormwater management outlet for future phases of the KNL subdivision.  There will be no further development on the KNL lands until a satisfactory stormwater management solution for the remaining phases of the draft approved subdivision is found.

Additional stormwater management ponds are a potential solution but further study of the area is required before that determination can be made. KNL does not dispute the need for a stormwater solution and have concurred with the findings of the Phase 1 Aecom report.

The City has conducted additional analysis of the existing water levels in Beaver and Kizell Ponds and confirmed that though they exceed peak flow and original design targets there is no risk of flooding to the existing community. As mentioned above, no further development flows  will be permitted to drain to these areas pending the additional study required and the determination of an overall stormwater management solution. The next phase of the Study will commence this month.” (emphasis added)

According to the definitions section of the Ontario Professional Engineers Act:

“practice of professional engineering” means any act of planning, designing, composing, evaluating, advising, reporting, directing or supervising that requires the application of engineering principles and concerns the safeguarding of life, health, property, economic interests, the public welfare or the environment, or the managing of any such act;” (emphasis added)

To be compliant with the Ontario Professional Engineers Act, the “additional analysis” referred to above must have been performed by, or signed off by, a professional engineer – BEFORE it was released.  To do otherwise would be a violation of the Ontario Professional Engineers Act, Section 12:

12.  (1)  No person shall engage in the practice of professional engineering or hold himself, herself or itself out as engaging in the practice of professional engineering unless the person is the holder of a licence, a temporary licence, a provisional licence or a limited licence.

(2)  No person shall offer to the public or engage in the business of providing to the public services that are within the practice of professional engineering except under and in accordance with a certificate of authorization.

(3)  Subsections (1) and (2) do not apply to prevent a person,

(b) from doing an act that is within the practice of professional engineering where a professional engineer assumes responsibility for the services within the practice of professional engineering to which the act is related;” (emphasis added)

In the interest of public safety, why won’t the City release to the public the “additional analysis” that was performed as well as disclose the Professional Engineer that signed off on it?

Is it because no professional engineer signed off on a statement concerning the public safety of engineering works?  Where is the Professional Engineers Society of Ontario?